JSJobShop OS
Demo mode
Active role: Admin

Demo mode — Quotes, jobs, capacity, scrap, audit, generated outputs are real Postgres state. Email notifications, ERP sync, Shop-floor printing are stubbed.

Jobs

All jobs

Production jobs from quote conversion through ship. Click a row to open the job detail.

J-2036Aspen Cabinet Co.Cabinet drawer facesLaserApprovedJun 5, 2026
On track
J-2099Pinecrest ArchitecturalCustom architectural louversLaserApprovedJun 6, 2026
On track
J-2030Aspen Cabinet Co.Cabinet face panels (run 412)LaserApprovedJun 13, 2026
On track
J-2023Bluegrass Steel WorksPipe rack weldments (run prior)Press BrakeClosedApr 1, 2026
On track
J-2025Pinecrest ArchitecturalSoffit panels (pilot)Press BrakeClosedApr 6, 2026
On track
J-2022Aspen Cabinet Co.Cabinet face panels (run 411)LaserClosedApr 11, 2026
On track
J-2024Cedar Valley IndustriesEquipment guards prototypeWeldClosedApr 18, 2026
On track
J-2021Northstar SignsChannel letter blanksLaserClosedApr 26, 2026
On track
J-2070Riverline FabricationStainless food-cart rush orderWeldIn productionMay 17, 2026
Due in 1 day
J-2033Riverline FabricationHeat-treat cart 2/4Press BrakeIn productionMay 25, 2026
On track
J-2051Pinecrest ArchitecturalArchitectural soffit panels (run A)Press BrakeIn productionMay 26, 2026
Behind schedule on Press Brake
J-2053Lakeside Marine ServicesMarine equipment housingsPress BrakeMaterials pendingMay 28, 2026
On track
J-2032Lakeside Marine ServicesMarine boom bracketsWeldQA pendingMay 20, 2026
On track
J-2050Riverline FabricationHeat-treat cart 1/4Press BrakeQueuedMay 21, 2026
Press Brake overcommitted this week
J-2035Cedar Valley IndustriesPowder-coated equipment guardsLaserQueuedMay 30, 2026
On track
J-2031Granite State MillworkMillwork mount bracketsWeldReady to shipMay 18, 2026
On track
J-2042Bluegrass Steel WorksPipe rack weldmentsPress BrakeReworkMay 23, 2026
Active rework following 12% scrap event
J-2052Granite State MillworkSign brackets, batch 88Press BrakeScheduledMay 24, 2026
On track
J-2034Northstar SignsChannel letter set, smallLaserScheduledMay 27, 2026
On track
J-2020Riverline FabricationStainless food cartsWeldShippedMay 8, 2026
On track