JSJobShop OS
Demo mode
Active role: Admin

Demo mode — Quotes, jobs, capacity, scrap, audit, generated outputs are real Postgres state. Email notifications, ERP sync, Shop-floor printing are stubbed.

SMALL-MANUFACTURER PRODUCTIONLive demo · v1.5

JobShop OS

Production scheduling and shop-floor tracking for small manufacturers — work orders move from estimate to ship across machines, operators, materials, and quality checks, with promised dates that actually mean something.

ForMachine, fab, cabinet, sign, print, metal shopsSmall custom manufacturers (3–50 employees)Job-order shops competing on lead time

Welcome, Admin

Heartland Fabrication

Production dashboard — quotes, jobs, capacity, materials, scrap, and audit in one surface.

Demo mode
WIP value
$24,510
258h × $95 blended rate
Quote pipeline
$57,925
2 submitted awaiting approval
At-risk jobs
4
Behind schedule or in rework.
Open jobs
14
Approved → ready to ship.
Scrap to review
2
Above-tolerance, awaiting supervisor.
Capacity flags
1
Work centers over weekly capacity.
Work-order traveler · J-2035
Cedar Valley Industries — Powder-coated equipment guards. Print-ready packet with routing, materials, operator sign-off lines, and quality box.
Marquee artifact
Routing steps
5 (Laser → Press Brake → Weld → Paint → QA)
Materials reserved
8 SKUs
Work orders
5 queued
Where to start by role
Each shop role gets a one-screen first move. Switch personas in the top bar.
Owner / GM
Approve over-threshold quotes (>$50k) and watch the at-risk queue.
Review quotes →
Scheduler
Rebalance work-center load; resolve Press Brake overcommit.
Open capacity grid →
Supervisor
Disposition above-tolerance scrap and release jobs to QA.
Open quality queue →
Operator
Run today’s queue: log parts good and parts scrap by routing step.
Open shop floor →
Estimator
Build new quotes from RFQs; submit over-$50k quotes for owner approval.
Open quotes →
Purchasing
Reserve materials for newly approved jobs; chase shortages.
Open materials →
Quality
Sign off inspections; assign reason codes on rework orders.
Open inspections →
Customer service
Answer status questions; print work-order travelers for the floor.
Print J-2035 traveler →
Recent audit events
Latest 8 of every state change, decision, scrap log, and generated output.
All audit →
  • 11 h ago
    generated output
    GeneratedOutput · cmp8fjgg
    Work-order traveler generated for J-2035. (×15)
    by Janelle Wu
  • 2 d ago
    generated output
    GeneratedOutput · cmp8fjgg
    SCN-003: Work-order traveler generated for J-2035.
    by Rosa Holmgren
  • 2 d ago
    state changed
    Job · cmp8fjgg
    Slotted into the queue.
    by Priya Shankar
  • 2 d ago
    inspection recorded
    QualityInspection · cmp8fjm0
    Pass on J-2031 final QA.
    by Mei Tanaka
  • 2 d ago
    state changed
    Job · cmp8fjh6
    Ready to ship.
    by Devon Ross
  • 2 d ago
    capacity overcommitted
    WorkCenter · cmp8fjdy
    SCN-004: Press Brake load = 52h vs 40h capacity.
    by Priya Shankar
  • 3 d ago
    rework created
    ReworkOrder · cmp8fjlo
    SCN-002: opened RW-J-2042-01 for 6 affected parts.
    by Devon Ross
  • 3 d ago
    state changed
    Job · cmp8fjgd
    SCN-002: in_production → rework.
    by Devon Ross
At-risk jobs
Jobs flagged with delivery or quality risk — owner_gm and scheduler attention.
J-2070Riverline FabricationWeldIn productionMay 17, 2026
Due in 1 day
J-2050Riverline FabricationPress BrakeQueuedMay 21, 2026
Press Brake overcommitted this week
J-2042Bluegrass Steel WorksPress BrakeReworkMay 23, 2026
Active rework following 12% scrap event
J-2051Pinecrest ArchitecturalPress BrakeIn productionMay 26, 2026
Behind schedule on Press Brake

5 routing steps · 14 material reservations · 8 recent audit events shown above.