SMALL-MANUFACTURER PRODUCTIONLive demo · v1.5
JobShop OS
Production scheduling and shop-floor tracking for small manufacturers — work orders move from estimate to ship across machines, operators, materials, and quality checks, with promised dates that actually mean something.
ForMachine, fab, cabinet, sign, print, metal shopsSmall custom manufacturers (3–50 employees)Job-order shops competing on lead time
Welcome, Admin
Heartland Fabrication
Production dashboard — quotes, jobs, capacity, materials, scrap, and audit in one surface.
WIP value
$24,510
258h × $95 blended rate
Quote pipeline
$57,925
2 submitted awaiting approval
At-risk jobs
4
Behind schedule or in rework.
Open jobs
14
Approved → ready to ship.
Scrap to review
2
Above-tolerance, awaiting supervisor.
Capacity flags
1
Work centers over weekly capacity.
Work-order traveler · J-2035
Cedar Valley Industries — Powder-coated equipment guards. Print-ready packet with routing, materials, operator sign-off lines, and quality box.
Marquee artifact
Routing steps
5 (Laser → Press Brake → Weld → Paint → QA)
Materials reserved
8 SKUs
Work orders
5 queued
Capacity overcommitted on 1 work center
Press Brake is loaded above its weekly capacity. Open the capacity grid to rebalance.
Where to start by role
Each shop role gets a one-screen first move. Switch personas in the top bar.
Owner / GM
Approve over-threshold quotes (>$50k) and watch the at-risk queue.
Scheduler
Rebalance work-center load; resolve Press Brake overcommit.
Supervisor
Disposition above-tolerance scrap and release jobs to QA.
Operator
Run today’s queue: log parts good and parts scrap by routing step.
Estimator
Build new quotes from RFQs; submit over-$50k quotes for owner approval.
Purchasing
Reserve materials for newly approved jobs; chase shortages.
Quality
Sign off inspections; assign reason codes on rework orders.
Customer service
Answer status questions; print work-order travelers for the floor.
Recent audit events
Latest 8 of every state change, decision, scrap log, and generated output.
- 11 h agogenerated outputGeneratedOutput · cmp8fjggWork-order traveler generated for J-2035. (×15)by Janelle Wu
- 2 d agogenerated outputGeneratedOutput · cmp8fjggSCN-003: Work-order traveler generated for J-2035.by Rosa Holmgren
- 2 d agostate changedJob · cmp8fjggSlotted into the queue.by Priya Shankar
- 2 d agoinspection recordedQualityInspection · cmp8fjm0Pass on J-2031 final QA.by Mei Tanaka
- 2 d agostate changedJob · cmp8fjh6Ready to ship.by Devon Ross
- 2 d agocapacity overcommittedWorkCenter · cmp8fjdySCN-004: Press Brake load = 52h vs 40h capacity.by Priya Shankar
- 3 d agorework createdReworkOrder · cmp8fjloSCN-002: opened RW-J-2042-01 for 6 affected parts.by Devon Ross
- 3 d agostate changedJob · cmp8fjgdSCN-002: in_production → rework.by Devon Ross
At-risk jobs
Jobs flagged with delivery or quality risk — owner_gm and scheduler attention.
| J-2070 | Riverline Fabrication | Weld | In production | May 17, 2026 | Due in 1 day |
| J-2050 | Riverline Fabrication | Press Brake | Queued | May 21, 2026 | Press Brake overcommitted this week |
| J-2042 | Bluegrass Steel Works | Press Brake | Rework | May 23, 2026 | Active rework following 12% scrap event |
| J-2051 | Pinecrest Architectural | Press Brake | In production | May 26, 2026 | Behind schedule on Press Brake |
5 routing steps · 14 material reservations · 8 recent audit events shown above.